Wednesday 28 August 2013

Implementing Cisco IP Routing

Exam Number                                  642-902 ROUTE
Associated                                        CCDP CCNP
Certifications 
Duration                                            120 minutes
Questions                                            45 - 55
Available Languages                      English and Japanese

Practice Exam

https://learningnetwork.cisco.com/community/certifications/ccnp/route?tab=practice

Exams Cost

https://learningnetwork.cisco.com/docs/DOC-12825

Exam Topics

The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.

Implement an EIGRP based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing EIGRP in a network
  • Create an EIGRP implementation plan
  • Create an EIGRP verification plan
  • Configure EIGRP routing
  • Verify an EIGRP solution was implemented properly using show and debug commands
  • Document the verification results for an EIGRP implementation

Implement a multi-area OSPF Network, given a network design and a set of requirements

  • Determine network resources needed for implementing OSPF on a network
  • Create an OSPF implementation plan
  • Create an OSPF verification plan
  • Configure OSPF routing
  • Verify OSPF solution was implemented properly using show and debug commands
  • Document the verification results for an OSPF implementation plan

Implement an eBGP based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing eBGP on a network
  • Create an eBGP implementation plan
  • Create an eBGP verification plan
  • Configure eBGP routing
  • Verify eBGP solution was implemented properly using show and debug commands
  • Document verification results for an eBGP implementation plan

Implement an IPv6 based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing IPv6 on a network
  • Create an IPv6 implementation plan
  • Create an IPv6 verification plan
  • Configure IPv6 routing
  • Configure IPv6 interoperation with IPv4
  • Verify IPv6 solution was implemented properly using show and debug commands
  • Document verification results for an IPv6 implementation plan

Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements

  • Create a redistribution implementation plan based upon the results from a redistribution analysis
  • Create a redistribution verification plan
  • Configure a redistribution solution
  • Verify that a redistribution was implemented
  • Document results of a redistribution implementation and verification plan
  • Identify the differences between implementing an IPv4 and IPv6 redistribution solution

Implement Layer 3 Path Control Solution

  • Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
  • Create a Layer 3 path control verification plan
  • Configure Layer 3 path control
  • Verify that a Layer 3 path control was implemented
  • Document results of a Layer 3 path control implementation and verification plan
  • Implement basic teleworker and branch services
  • Describe broadband technologies
  • Configure basic broadband connections
  • Describe basic VPN technologies
  • Configure GRE
  • Describe branch access technologies

No comments:

Post a Comment